Commercial Vehicle Infrastructure Integration

I-95 Corridor Coalition

in partnership with

New York State Department of Transportation

CVII Project Library

Contractual deliverables/documents posted on this site have been officially accepted by NYSDOT and the I-95 Coalition, after review by the Project Advisory Committee as applicable. These documents are for internal use only by those having access to this site, and not for general publication.

 
Document Category Contract Reference Links
Procurement Documents NYSDOT CVII Request for Information

July 2007

View PDF
NYSDOT Request for Proposals - February 2008

View PDF

Contract Schedule A – February 27, 2009 View PDF
NYSDOT Form 255NAE – March 28, 2008 View PDF

SYSTEM DESIGN AND ARCHITECTURE
CVII General Network Architecture – June 2009 Schedule A View PDF
CVII Detailed Project Architecture – June 2009 Schedule A View PDF
Detailed System Specifications, Architecture, and Schematics    

 

TASK 1 DELIVERABLES

CVII Program Plan – November 1, 2010 Schedule A

Task 1 – Overall Plan deliverable includes:
  • Scope Statement
  • Work Breakdown Structure
  • Program Schedule
  • High Level Design
  • Staffing Plan
View PDF

TASK 2 DELIVERABLES
CVII Onboard Equipment (OBE) - Base Hardware Infrastructure

System Overview and Concept of Operations – October, 2009

Schedule A Scope of Work

Task 2 – Create a base VII hardware infrastructure suitable for a commercial vehicle -- VII Compliant On-Board Communication Equipment (OBE) research, develop, test and demonstrate VII compliant on-board communication equipment (OBE) in a commercial vehicle provided by the Volvo team.

View PDF
Human-Vehicle Interface (HVI) Research Report – August 2009 Schedule A Scope of Work

Task 2

View PDF
OBE-RSE Acceptance Test Plan – December 2009 Schedule A Scope of Work

Install a VII RSE for system testing/demonstration, and develop two simple VII services, Vehicle to infrastructure (V2I) and infrastructure to vehicle (I2V) to prove the hardware functionality.

View PDF

Hardware Identification and system design re.

CVII Network Architecture for OBE – RSE and RSE - OBE Probe and In-Vehicle Signage

Acceptance Test Results – February 2010

Schedule A View PDF

Reference Document – April, 2011

DSRC Mobile Communication Unit/Vehicle Gateway Interface View PDF

Reference Document – Nov. 2011

OBE Installation Kit View PDF

Reference Document – Dec. 2011

OBE Wiring Diagram View PDF

Reference Document – Dec. 2011

OBE System Architecture View PDF
Reference Document – Dec. 2011 CVII DSRC Message Sets View PDF

TASK 3 DELIVERABLES
Driver Credentials Validation

Concept of Operations – June 2010

Schedule A Scope of Work

Task 3

View PDF
Acceptance Test Plan

Driver Credentials – October 2010

View PDF
CVII Biometric Identification Report – November 2010 View PDF

Hardware Identification and system design re.

CVII Network Architecture for Driver Credential Verification

Acceptance Test Results

Appendices A and B – November 2010

View PDF

TASK 4 DELIVERABLES
Wireless Vehicle Safety Inspection

Concept of Operations – June 2010

Schedule A Scope of Work

Task 4

View PDF
Acceptance Test Plan

Wireless Vehicle Safety Inspection – October 2010

View PDF

Hardware Identification and system design re.

CVII Network Architecture for Wireless Vehicle Safety Inspection

Acceptance Test Results

Appendices A, B, C – November 2010

View PDF

TASK 5 DELIVERABLES
Concept of Operations

Vehicle-to-Vehicle Alert

Schedule A Scope of Work

Task 5

View PDF

Acceptance Test Plan – April 2011

Acceptance Test Plan

Task 5

View PDF

Acceptance Test Report – November 2011

Acceptance Test Plan

Task 5

View PDF

TASK 6 DELIVERABLES
Concept of Operations Task 6 integrates the driver credentials verification application developed in Task 3 and the wireless roadside vehicle safety inspection application developed in Task 4 with the specified NYSDOT back-office systems. View PDF 
Final Demonstration of CVII OBE Systems Demonstrated at ITS World Congress, October 2011  
Final CVII Demonstration Demonstrated at ITS World Congress, October 2011  

TASK 7 DELIVERABLES
Program Management and Status Reporting Status Report - April, 2011 View PDF 
Status Report - May, 2011 View PDF 
Status Report - June, 2011 View PDF 
Status Report - July, 2011 View PDF 
Status Report - August, 2011 View PDF 
Status Report - September, 2011 View PDF 
Status Report - October, 2011 View PDF 

2011 ITS World Congress CVII Demo Summary

View PDF 
Status Report - November, 2011 View PDF 
Status Report - December, 2011 View PDF 
Phase 1 Final Report - December, 2011 View PDF 

TASK 8 DELIVERABLES
Public Outreach/Outreach Support CVII Trifold Brochure View PDF
CVII Trifold Board View PDF
CVII Project One-Pager View PDF

TASK 9 DELIVERABLES
Concept of Operations – December 2011

Task 9 builds on the base CVII infrastructure developed in Tasks 2, 3, 4,
and 5 providing a vehicle alert application for vehicle-to-vehicle (V2V)
interactions related to passing and merging traffic using data exchanged via
V2V communication.

View PDF

TASK 10 DELIVERABLES
Concept of Operations – December 2011

Task 10 builds on the base CVII infrastructure developed in Tasks 2, 3,
4, and 5 providing a vehicle alert application for commercial vehicles
approaching railroad grade crossings.

View PDF

ITS 2011 WORLD CONGRESS CVII PROJECT DEMONSTRATION
CVII Project Demo Storyboard - January 2011   View PDF
World Congress Face-to-Face Meeting - February 9, 2011  View PDF
World Congress CVII Demo and Outreach Plan - April 2, 2011  View PDF

PRESENTATIONS AND MEETINGS

2008 Smart Roadside Workshop

Date: April 29, 2008

Presented by Rick McDonough, NYSDOT

View PDF

Project Team Meeting

VII/DSRC Protocols Overview

Date: June, 2008

Presented by TechnoCom

View PDF

CVII Project Team Kick-Off Meeting

Date: May 5 - 6, 2009

Meeting Agenda

View PDF

CVII Overview - Presented by Rick McDonough, NYSDOT

View PDF

New York State Existing VII Overview and Lessons Learned – Presented by Dmitri Khijniak, Kapsch

View PDF

ITS America Annual Meeting

Date: June 2, 2009

Presented by Ram Kandarpa, Booz/Allen/Hamilton

View PDF

CVII- Atlanta, GA

Date: November, 2009

Presented by Jan Hellaker, Volvo

View PDF

CVII Project Team Meeting

Date: January 7, 2010

Presented by Rick McDonough, NYSDOT

View PDF

USDOT IntelliDrive Webinar - Safety Applications for Commercial Vehicles

Date: January 20, 2010

Presentation Slides 31-40 – CVII – Presented by Rick McDonough, NYSDOT

View PDF

Webinar Transcript – CVII at pages 11-29

View PDF

CVII Overview

Date: May 4, 2010

Presented by Steve Sprouffske, Kapsch TrafficCom

View PDF

TIMTC Inaugural - Las Vegas, NV

Date: October 7, 2010

Presented by Skip Yeakel, Volvo

Includes NYSDOT TIGER Grant Overview

View PDF

FMCSA Safety Technology Showcase - Greene County, TN CVII Advisory Team Meeting

Date: October 14, 2010

Presented by Rick McDonough, NYSDOT

View PDF

Meeting Minutes and Presentations Greensboro, NC

Date: April 21, 2011

Presented by Rick McDonough, NYSDOT and the Volvo Team

View PDF

2011 ITS-NY 18th Annual Meeting and Technology Exhibition
Saratoga Springs, NY

Date: June 10, 2011

Presented by Rick McDonough, NYSDOT

View PDF

Print